POWER MANAGEMENT

Overview Projects Of The Year Transmission & Distribution Timeline
————-

2002

TNBD Central Project

32

Substation City

2005

Harris RTU Replacement

5

Substation City

2006-2008

TNBD Southern Project

1500

Substation City

2008

Talus RTU Replacement

8

Substation City

2009-2010

SCADA/RTU Uitm Shah Alam

11

Substation City

2011-2012

TNBD RTU

25

Substation City

2012-2013

TNBD RTU

12

Substation City

2017-2018

TNBD RTU

24

Substation City

2017-2018

TNBD RTU

200

Substation City

2016-2018

TNBD RTU

66

Substation City

Overview Projects Of The Year Transmission & Distribution
————-

Overview Projects with IPP
————-

OUR HISTORY
————-

In 2006, Progressive Impact has been awarded the TNB Distribution Southern RTU Project through Open Bid process. The project had been completed successfully due to its understanding, commitments and compliance to the critical success factor.The project scope is to design, supply, install, test and full commission of 1500 RTU’s for Southern Region Substations. This project is a very important and strategic for TNB in order for TNB to improve its efficiency, customer satisfaction and to be able to be benchmarked against other World Class utility operator.
For Distribution we have more than 1800 substation installed with our solution offer.

OUR HISTORY

The critical success factor that always been adopted by Progressive Impact in all its RTU project implementation are:
  • Supply of reliable and well tested (TNB Certified/SIRIM certified) RTUs;
  • Field Proven of RTU in TNB Substations in Malaysia is a critical factor to avoid technical risk;
  • On time delivery and implementation of the project;
  • Solid local technical support and after sales service;

OUR TRACK RECORD LAYOUT
————-

Our Foxboro RTUs which we have supplied to TNB has fully met all TNB RTU Certification Requirement, and have been reliable and operate well in TNB substations. Given that we are a local company, we are in a position to provide very strong technical support and after sales service to TNB as has been proven in the past 7 years. Major portion of the work (above 70%) i.e. design, engineering, testing, installation and commissioning are done by us in Malaysia.

OUR OFFERINGS

    • RTU C50
    • RTU SCD5200
    • RTU SCD6000
    • HU_BI
    • HU250
    • Saitel DP
    • Substation Control System (SCS)
    • Substation Automation
    • Solar Power Interconnection Renewal Energy
    • General Automation
    • IntelaTrac Datalogger
    • Dynamic Risk Analysis
    • IntelaTrac Datalogger
    • Dynamic Risk Analysis
    • Human Machine Interface